Tag Archives: lever arm

Work on the fire door is completed and a start made on a replacement lever assembly

Construction of the fire door assembly for the Fowler A7 traction engine is completed and a start on the next part is made, namely a large control lever assembly. Continue reading

Posted in Fowler A7 2" scale traction engine build, General engineering posts | Tagged , , | Leave a comment