2009 Objectives
After reviewing the outcome of the first full year's model engineering objectives and new projects I would like to build I have come to the following plan. Some dates will read 2008 if they started life there.
For 2009 this page will be updated during the year.
The key for objectives:
f = Fowler
ic = internal combustion engine
t = tools
m = miscellaneous or unplanned projects
Objectives 2009
Objective number and description Status
3f/2008 Blow down cock Not started
5f/2008 Bolt steam chest to Boiler Not started
1f/2009 Complete brass tender and fit Not started
1t/2008 Ball turning tool To be completed
2t/2008 Tool grinding centre Not started
4t/2008 Manual handling system Not started
1t/2009 Tool post and holders for both lathes Not started
8m/2008 Myford ML7 Bench To be completed
9m/2008 Bar stock storage system To be completed
11m/2008 Anodising system To be completed
1m/2009 Write Chess build article To be completed
1ic/2009 Build 4cyl Seal petrol engine Not started
2ic/2009 Start on 5cc Sparey diesel Not started
3ic/2009 Start on CAD V6 or 8 engine Not started
1s/2009 Design and build a 'Wobbler' Not started
No doubt there will be many unplanned projects and the programme above will be 'challenging' but thats how it should be, after all it is a hobby!