2008 results
To help me gauge my progress as a model engineer (in my first full year), I set myself several objectives. Since the year end is approaching very fast I need think about 2009 and also what I have achieved in 2008. For some reason the 2008 objectives have remained on one of my whiteboards in the workshop and have not been published here. So both the objectives and results for 2008 are set out below.
The 2009 objectives are laid out on their own page.
The key for objectives:
f = Fowler
ic = internal combustion engine
t = tools
m = miscellaneous or unplanned projects
Objectives 2008
1f/2008 Fire door Completed
2f/2008 Ash pan Completed
3f/2008 Blow down cock To be completed
4f/2008 Wash out plug Completed
5f/2008 Bolt steam chest to Boiler Not started
6f/2008 Dummy throat plate Completed
7f/2008 Dummy manhole cover Completed
8f/2008 Fix Hornplates & stand on wheels To be completed
1t/2008 Ball turning tool To be completed
2t/2008 Tool grinding centre Not started
3t/2008 Polishing centre Not started
4t/2008 Manual handling system Not started